Tag Archives: dredge

April 11, 2013 – High Water Dredging in C3

Dredge and Rainey Report High Water Dredging in C3 April 11, 2013 Summary of accomplishments: Total time dredging this week into Cell 3: 10.75 hours Total time dredging into Cell 3: 75 hours Total time at experimental site: 221.5 hours … Continue reading

Posted in Dredge Reports, Marsh Restoration, The Paul J. Rainey Wildlife Sanctuary | Tagged , , , , , , , | Comments Off on April 11, 2013 – High Water Dredging in C3

Dredge (and Rainey) Report Dredging resumed; Aerial photography, September 30, 2011

Summary of accomplishments: Dredging into Cell 5 resumed; additional 8.5 hours Aerial photographs by remote plane acquired of Christian Marsh and Dredge area Total cumulative time dredging in Cell 5: 53.5 hours Impediments: front winch (pump up/down) binds and quits; … Continue reading

Posted in Dredge Reports, Marsh Restoration, The Paul J. Rainey Wildlife Sanctuary | Tagged , , | Comments Off on Dredge (and Rainey) Report Dredging resumed; Aerial photography, September 30, 2011

Dredge (and Rainey) Report Dredging resumed; Aerial photography, September 28, 2011

Wednesday, September 28 – Aerial photography by Remote Plane Eddie Weeks from LSU was scheduled to arrive with his remote plane this morning. At 8am, I followed the airboat to Christian Marsh, where Timmy and I deployed the 4’ x … Continue reading

Posted in Dredge Reports, Marsh Restoration | Tagged , , , | Comments Off on Dredge (and Rainey) Report Dredging resumed; Aerial photography, September 28, 2011