Dredge (and Rainey) Report,Building Construction, September 23, 2011

Dredge (and Rainey) Report
Building Construction

September 23, 2011

Summary of accomplishments:

  • New canopy on the dredge
  • No dredging; but untangled the dredge hose
  • Finished outside of big building

Dredging has been postponed until the storage buildings have been minimally assembled and anchored down, and the dredge hose can be untangled. Over the last two weeks, we got the outside of the pump house together, and the floor and frame up for the big building.