Summary of accomplishments:

  • Filled Cell 4 to 5” below marsh level; pond water level stayed low so wasn’t worth dredging more
  • Cumulative dredge time directly in Cell #4 is 17.5 hours
  • Total cumulative dredge time is 62.5 hours
  • Completed foundation for large storage shed.
  • Completed 4’ x 4’ markers to be used for aerial photos by remote plane