Dredge (and Rainey) Report, August 26, 2011

Friday, August 26, 2011

Moon up before the sun(left). Frog with moon(Right).

Despite the exhaustion of yesterday, we were both up very early to get busy as soon as there was light outside. In a little over 2 hours, we finished the foundation (by 9am). Now that we have the process worked out, the smaller building shouldn’t take long at all – just not this week!

To finish the work for the week, we put pool noodles on the bottom of the 4×4 markers to help them float. One was tested and floated just above water level, which should be sufficient for its intended use.

Timmy at work at dawn(Left). The finished foundation with the stacked sections of the building in the background(Right).

Following the Goose back to Intracoastal City for the end of the work week.