Daily Archives: January 20, 2012

Dredge (and Rainey) Report Repairs January 20, 2012

Dredge (and Rainey) Report Repairs January 20, 2012 Summary of accomplishments: Replaced overhead winch; replaced control switch and block on right traveling winch Made 16 reed bundles Fluid mud to 7” below marsh level (-7 ML) throughout Cell 4; delta … Continue reading

Posted in Dredge Reports, Marsh Restoration, The Paul J. Rainey Wildlife Sanctuary | Leave a comment