Daily Archives: September 27, 2011

Dredge (and Rainey) Report Dredging resumed; Aerial photography, September 27, 2011

Tuesday, September 27 – Dredging into Cell 5 Timmy picked me up at the public dock at 8 am, I dropped my gear at the camp and we were at the dredge site by 9:00 am.  Since the water level … Continue reading

Posted in Dredge Reports, Marsh Restoration, The Paul J. Rainey Wildlife Sanctuary | Comments Off on Dredge (and Rainey) Report Dredging resumed; Aerial photography, September 27, 2011