Dredge (and Rainey) Report,Building Construction, September 23, 2011

Dredge (and Rainey) Report Building Construction September 23, 2011 Summary of accomplishments: New canopy on the dredge No dredging; but untangled the dredge hose Finished outside of big building Dredging has been postponed until the storage buildings have been minimally … Continue reading

Posted in Dredge Reports, Marsh Restoration, The Paul J. Rainey Wildlife Sanctuary | Tagged , , , | Comments Off on Dredge (and Rainey) Report,Building Construction, September 23, 2011

Dredge (and Rainey) Report, Building Construction, September 23, 2011

Friday, September 23, 2011 It was a slow morning. After 3 weeks of strenuous work in the heat and mosquitoes and the pressing anxiety of getting the buildings together during hurricane season, the satisfaction of completing the daunting job left … Continue reading

Posted in Dredge Reports, Marsh Restoration, The Paul J. Rainey Wildlife Sanctuary | Comments Off on Dredge (and Rainey) Report, Building Construction, September 23, 2011