Dredge (and Rainey) Report

Friday, September 9, 2011 Timmy and Karen resumed construction of the storage building right after sunrise. We had to move paneling and sheetrock, all the fittings, roof joists, door and trim to get to the last floor section. Timmy pulled … Continue reading

Posted in Dredge Reports, Marsh Restoration, The Paul J. Rainey Wildlife Sanctuary | Comments Off on Dredge (and Rainey) Report

Dredge (and Rainey) Report Post Tropical Storm Lee, September 09, 2011

Friday, September 09, 2011 Summary of accomplishments: Tropical Storm Lee impact assessment of both sites Dissembled stack for shop building and successfully constructed floor platform Tropical storm Lee came ashore on Saturday, September 3rd, and the storm center sat over … Continue reading