Category Archives: Marsh Restoration

July 11, 2013 – C3 full and AC in Guesthouse

Dredge and Rainey Report Cell 3 full and AC in the Guesthouse July 11, 2013 Summary of accomplishments: Cell 3 is at marsh level or above Total pump time this week = 4:10 hours Total time pumped directly into Cell … Continue reading

Posted in Dredge Reports, Marsh Restoration, Past Week Summary, The Paul J. Rainey Wildlife Sanctuary | Tagged , , , , , , | Leave a comment

June 7, 2013 – Highwater Dredging into Cell 3

Dredge and Rainey Report Highwater Dredging into Cell 3 June 7, 2013 Summary of accomplishments: Most of Cell 3 is at marsh level Total pump time this week = 5.75 hours Total time pumped directly into Cell 3 (.366 acres) … Continue reading

Posted in Dredge Reports, Marsh Restoration, The Paul J. Rainey Wildlife Sanctuary | Tagged , , | Leave a comment

April 11, 2013 – High Water Dredging in C3

Dredge and Rainey Report High Water Dredging in C3 April 11, 2013 Summary of accomplishments: Total time dredging this week into Cell 3: 10.75 hours Total time dredging into Cell 3: 75 hours Total time at experimental site: 221.5 hours … Continue reading

Posted in Dredge Reports, Marsh Restoration, The Paul J. Rainey Wildlife Sanctuary | Tagged , , , , , , , | Leave a comment

March 8, 2013 – Low Low Water

Dredge and Rainey Report Low Low Water March 8, 2013 Summary of accomplishments: Most of Cell 3 is at -1” ML or better Spartina patens and Scirpus olneyi are spreading well Impediments: low water in the pond and canal This … Continue reading

Posted in Dredge Reports, Marsh Restoration, The Paul J. Rainey Wildlife Sanctuary | Tagged , , , , , | Leave a comment

March 5, 2013 – Another Small Dredge

Dredge and Rainey Report Another Small Dredge March 5, 2013   This report can be downloaded in PDF file format by clicking the Dredge and Rainey Report, Another Small Dredge hyperlink. On Tuesday, March 5, Jimmy Delery out of New … Continue reading

Posted in Dredge Reports, Marsh Restoration | Tagged , , , | Leave a comment

February 2013 update

Hi all, it was 2 months (since December 5!) before we could dredge again. Water levels, weather and schedules just didn’t align for any dredging until early February, when we managed to add about 4 hours to Cell 3. This … Continue reading

Posted in Marsh Restoration, Quick Report, The Paul J. Rainey Wildlife Sanctuary | Leave a comment

February 8, 2013 – Resume Dredging

Dredge and Rainey Report Resume Dredging February 8, 2013   Summary of accomplishments: Most of Cell 3 is at -1” ML or better Pumped for 4.75 hours into Cell 3 Total time pumped directly into Cell 3 (.366 acres) = … Continue reading

Posted in beach survey, Dredge Reports, Marsh Restoration, The Paul J. Rainey Wildlife Sanctuary | Tagged , , , , , , | Leave a comment

Dec 19, 2012 – Cell 3 – Exposed Mudflat

Dredge and Rainey Report Cell 3 – Exposed Mudflat December 19, 2012   Summary of accomplishments: Most of Cell 3 is at -1” ML or better Pulled 3 sections of hose out of the pond Total time pumped directly into … Continue reading

Posted in Dredge Reports, Marsh Restoration, The Paul J. Rainey Wildlife Sanctuary | Leave a comment

Dec 7, 2012 – Cell 3 Almost Full

Dredge and Rainey Report Cell 3 Almost Full December 7, 2012   Summary of accomplishments: Most of Cell 3 is at -1” ML or better Record pumping day of 8 straight hours with no break downs or stoppages!! Total time … Continue reading

Posted in Dredge Reports, Marsh Restoration, The Paul J. Rainey Wildlife Sanctuary | Leave a comment

Dredge and Rainey Report Low Water

Dredge and Rainey Report Low Water November 09, 2012   Summary of accomplishments: No dredging this week Total time pumped directly into Cell 3 (.366 acres) = 42.75 hours Total time in study cells = 189 hours Impediments: Low low … Continue reading

Posted in Dredge Reports, Marsh Restoration, The Paul J. Rainey Wildlife Sanctuary | Leave a comment